hello. This is RS Korea. These days are days when I encounter lush green scenery whenever I walk down the street, giving me a refreshing energy. With this refreshing feeling, I will begin the introduction of the construction case. (Please note that this construction case is one in which inspection and meetings were conducted in advance.) Based on some special matters discussed in the previous inspection, we have made slightly new construction preparations. - We want to vary the installation location as the construction progresses - Because it is outdoors. Combining the fact that the device needs to be protected from water and the fact that the interior is made of steel structure making it difficult to drill holes for product installation, one conclusion is shown in the photo below.



A transparent high box ensures visibility and prevents moisture infiltration, and a high-strength magnetic bracket ensures convenient mounting and mobility.



Install the external electronic signboard at an angle that office personnel can easily see. After that, insert the communication line into the waterproof flexible according to the predetermined length. In a typical site, the wires are inserted after laying the corrugated pipe, but there is no problem in changing the order depending on the site. It may seem like you're doing a cheeky job with your hands in your pockets, but you're actually putting trash in your pockets. I can't emphasize enough how many times I need to keep my workplace organized.


After confirming the measuring device installation point and completing the wiring, return to the ground and complete the wiring. I am grateful that there is a distribution board for power supply on the ground, which makes installation more smooth.



The spare wire was hidden well so that it did not get caught in the worker's movement line, and the power to both devices was turned on. Gas concentration status is displayed normally. I later remember that I didn't take a picture of the ground-level electronic signboard, and I feel bitter.


We provide product training. The space was so small that I could only look at it from a distance. Standard gas is injected to test the change in concentration, change in color of the display, and sound and light alarm. Installation company: Undisclosed Installation location: Dangjin, Chungcheongnam-do Installation product: fix800 5gas o2 co co2 h2s ex and warning light + outdoor enclosure and custom-made magnetic bracket + 5ch display board outdoor type and warning light 2 places in total Order date: February 25 (Air order due to emergency schedule - Additional costs apply) Installation date: March 10, 9:00 - 12:00 (approximately 14 days from the order date) Installation personnel: 3-person installation Special features: - Installation of magnetic bracket - Power supply using 220v outlet without separate electrical work - Required materials GW Corrugated pipe AWG Shield wire Approximately 50m and other miscellaneous materials Installation site of 5 gas measuring devices for tunnel vertical tunnel safety It was a case. thank you