Installed Gases
Project Details
After a weekend of fine dust, rain, and terrible weather, winter has finally arrived. Hello, I am Pilseung Jeong, assistant manager at RS Korea. It's been a while since I've been on the blog. Today, I'm talking about the FIX 800 H2 0-1000ppm installable gas meter model and the status board installation work to measure hydrogen concentration in the laboratory of a pharmaceutical company in Sonae, Cheongju, North Chungcheong Province. For this installation, the construction estimate was calculated based on an on-site meeting and inspection last October. Let's get started.

When I came to my senses, the scenery outside had turned white. A scene from the Japanese novel Snow Country, which won the Nomel Literary Award, comes to mind. The novel is famous for its beautiful introduction. - As I left the long road in Pyeongtaek, it was a snow town, and the bottom of the night became white. The car stopped at the drowsy rest area -


The color of the pants and the posture make you feel like a frog. After installing the measuring device at the point agreed upon with the user, we proceed with drilling to fly the cable with a power tool. The better the building is, the more difficult it is to drill.

In order to reduce the feeling of difference with the existing PVC pipe, we used waterproof flexible of the same thickness and color. It was disappointing that it looked a little obvious in real life, but the photo is more believable.

An electronic display board with warning lights was installed in the office space outside the lab. The measuring instrument FIX800 and communication + power lines are connected by wire. The 220V power supply to the electronic display board is well hidden with a thin, white duct. Some of you may have discovered that the power cord was pulled down after reading this article. Inside the site, the process was in progress and XX ppm was coming out. Although it is not at a dangerous level, it is mosaiced to protect information.

After completion of construction and cleanup, we will invite the person in charge to demonstrate the measuring equipment and provide operating training. The prepared calibration gas was injected into the device to check alarm operation and electronic display interconnection. This can be said to be a safe service that you can receive if a measuring instrument handling company even performs the installation.

After injection of calibration gas, it works well on the external electronic display board. You can easily check changes in numbers while working.10 We gathered together, skipped lunch, and finished at 3 o'clock. Summary below.1. In Cheongju 2. 3. Installed FIX800 H2. 4. For medicine, go to the pharmacist. For measuring device installation, go to the measuring device company.