[RS KOREA] [Installation] FIX800 installation of wastewater treatment plant in Jeju Island golf course

제주도 · 2024.12.11

Applied Markets

Wastewater

Installed Gases

O2 (Oxygen) H2S (Hydrogen Sulfide)

Project Details

hello. This is Rex. http://blog.naver.com/rs-korea1/223562645748 Since I had time left after conducting the A/S inspection in Jeju Island last time, I visited the place where the on-site inspection was conducted one more time to request installation progress. Last time I went to Jeju Island, I remembered that I had to take the first flight at 9 o'clock to be able to enter the site at 9 o'clock, so I tried to go the day before.

I wanted to go in advance on Monday evening, but because everything was sold out, I went on the first flight on Tuesday, so I kept in mind that not everything would go as I wanted, so I went with Plan B on the first flight. Still, I felt good because the measuring instrument and electronic display board sent as cargo to Jeju Island arrived without any problems at all. ■ Purpose of installation: Installed in a sewage treatment plant, so the entrance is also narrow and enclosed, so it is installed to reduce the risk of suffocation and reduce workers' exposure to gas generated from the sewage treatment plant. We are planning to install a complex gas meter FIX800 (O2 0-30%Vol, H2S 0-100ppm). We can measure by attaching pumps to a portable gas meter and workers can proceed, but in the end, we have to go near the entrance to measure, and if the pump is further away than a certain distance, the response is delayed, so we will proceed with an installation-type gas meter to increase convenience and safety.■ Installation items

It will proceed with the installation of FIX800 2GAS and an electronic display board. Just looking at the photo, the weather was bright and warm and the wind was cool, so you can understand why it was sold out.■ Installation location

We requested that the sewage treatment plant be installed so that the concentration inside can be seen when the iron door at the entrance is opened.

A request was made to install a signboard on the ceiling before opening the entrance to the sewage treatment plant no. 2 so that it can be seen directly from the outside.■ Installation

Installation is underway at a total of two sewage treatment plants. It took a lot of time to carefully construct the conduit along the ceiling.

Like Jin, it was installed so that the internal concentration values ​​​​are visible when viewed from above, and was installed in the form of a sign so that the concentration can be checked before entering.

 

After injecting test gas and setting off an alarm, we explained how calibration and A/S are performed, and then closed the site. -------------------------------------------------------------------------------------------------------

The safety of workers can be confirmed when using a portable gas meter, but this is part of the operational guide to see how safety, convenience, and efficiency increase when using an installed type. Of course, portable gas meters cannot be completely ruled out, but by checking the current concentration with an installed gas meter before using a portable gas meter and then using a portable gas meter, worker safety is further increased, so we suggest an installed gas meter. There are many installation examples on the blog. Please take a look and see how it is operated. If you have any questions, please feel free to contact us. Installation-related inquiries or gas meter consultations are always welcome. http://rs-korea.com/shop/goods_view.php?gno=326&goods_name=800&x=0&y=0